ZSP Elevator Installation Platform
Product Description
During the process of installation, the preparation work of ZSP can be completed within 2 hours, and the whole elevator installation and construction work of 30-floor high elevator can be easily completed within 15-18 working days. The ZSP elevator installation and construction platform greatly reduces the construction cost. The contrast data of ZSP elevator installation method without scaffolding and traditional installation method are shown in Table 1.
Passengers and commodity are totally forbidden on the construction platform. When using it, life belt must be fastened to a rope which is independent of the construction platform.
Technical information
The differences between platform and traditional scaffolding
Installation method |
Workers |
Working Days |
Quality Coefficient |
Safety Coefficient |
Elevator Installation Platform |
2-3 |
15-18 days |
99% |
100% |
Traditional installation with scaffolding |
4-6 |
25-28 days |
80% |
50% |
The main parameters of ZSP series
Item |
Technical Parameter |
Type |
A |
B |
C |
S80 |
S100 |
D |
Adjustment range(left and right) |
1.32m~ 1.72m |
1.12m~ 1.32m |
1.72m~2.02m |
1.72m~2.02m |
1.72m~ 2.02m |
2.02m~ 2.83m |
Adjustment range(front and behind) |
1.47m~ 2.07m |
1.47m~ 2.07m |
1.47m~2.07m |
1.47m~2.07m |
1.47m~ 2.07m |
1.68m~ 2.67m |
Lifting force |
1t |
1t |
1t |
1.6t |
2t |
2t |
Rated load |
400kg |
400kg |
400kg |
400kg |
400kg |
400kg |
Weight |
400kg |
350kg |
460kg |
514kg |
514kg |
570kg |
Elevator shaft height |
≤150m |
≤150m |
≤150m |
≤200m |
≤300m |
≤300m |
Rising speed |
0.14/s |
0.14/s |
0.14/s |
0.14/s |
0.14/s |
0.14/s |
Descent speed |
0.16/s |
0.16/s |
0.16/s |
0.16/s |
0.16/s |
0.16/s |
Specialized wire rope |
φ10.2 |
φ10.2 |
φ10.2 |
φ10.2 |
φ10.2 |
φ10.2 |
Anti-fall device |
Braking ability |
2t |
2t |
2t |
2t |
2t |
2t |
Safety lock |
Allowed impact force |
30kn |
30kn |
30kn |
30kn |
30kn |
30kn |